Alluri Sitarama Raju International Airport

Bhogapuram Airport: the complete guide

Everything about the Alluri Sitarama Raju International Airport (ASR International Airport, IATA: VTZ) at Bhogapuram, Vizianagaram district — how it was built, what it can handle, and what it changes for North Andhra.

Inaugurated 1 August 2026Flights from 17 August 2026IATA: VTZVizianagaram district
Project cost
₹5,640 cr

PPP, DBFOT basis

Code 4E runway
3,800 m

Among the longest in India

Passengers a year
6 million

Phase 1 capacity

Total site area
2,203 acres

~500 acres held for expansion

Overview

Why this airport matters

For seventy years, air travel in North Andhra ran through a civil enclave inside a naval air station. Bhogapuram ends that constraint.

Visakhapatnam's old airport was a civil enclave at INS Dega. It worked, but it was hemmed in by defence land and urban development, with effectively no room to lengthen the runway, build a larger terminal or add aircraft parking bays. Passenger growth had nowhere to go.

Bhogapuram was the answer: a greenfield site of 2,203 acres about 40 to 45 km north-east of Visakhapatnam, with roughly 500 acres deliberately held back for future expansion. That headroom is the whole point. The airport opens with capacity for six million passengers a year and a master plan that scales past 40 million.

The knock-on effects are already visible. Land along the Bhogapuram airport corridor has re-rated sharply, hospitality operators are moving into the Bhimli and Rushikonda belt, and the Araku, Borra and Buddhist circuits gain an international gateway an hour away.

Runway and aircraft at Alluri Sitarama Raju International Airport, Bhogapuram, Vizianagaram district
Alluri Sitarama Raju International Airport at Bhogapuram — IATA VTZ, ICAO VOVI. Open for scheduled flights from Sunday, 17 August 2026.

Bhogapuram, Vizianagaram district, off NH-16 — about 40–45 km from Visakhapatnam. Distance from Vizag →

Alluri Sitarama Raju International Airport — key facts
Official nameAlluri Sitarama Raju International Airport
Also known asBhogapuram International Airport, ASR Airport
IATA codeVTZ (transferred from Visakhapatnam on 17 August 2026)
LocationBhogapuram, Vizianagaram District, Andhra Pradesh, India
Inaugurated byPrime Minister Narendra Modi · Saturday, 1 August 2026
Commercial flights beginSunday, 17 August 2026
Developer / operatorGMR Visakhapatnam International Airport Limited (GVIAL)
Development modelPublic-Private Partnership (PPP), DBFOT basis
Project cost₹5,640 crore
Total area2,203 acres (with ~500 acres reserved for future expansion)
Runway3,800 m Code 4E runway — among the longest in India
Aircraft handledWide-body ready: Boeing 777, Boeing 787 Dreamliner, Airbus A350 and Airbus A330
Passenger terminal78,000 sq m integrated passenger terminal (Phase 1)
Cargo terminal5,000 sq m cargo terminal
Phase 1 capacity6 million passengers per annum
Ultimate capacity40+ million passengers per annum
Distance from Visakhapatnamapproximately 40–45 km from Visakhapatnam city
Named afterAlluri Sitarama Raju, the tribal freedom fighter of Andhra Pradesh
Infrastructure

What has actually been built

The specifications that determine which aircraft can land here, and how many people can move through the terminal.

78,000 sq m passenger terminal

The Phase 1 integrated terminal is designed around architectural motifs drawn from regional heritage, and is built to move six million passengers a year without the congestion that constrained the old Vizag terminal.

3,800 m Code 4E runway

One of the longest runways in India, with a full-length parallel taxiway, CAT I instrument landing system and advanced LED airfield lighting. It takes wide-bodies including the Boeing 777, Boeing 787 Dreamliner, Airbus A350 and Airbus A330.

5,000 sq m cargo terminal

Dedicated cargo capacity of roughly 25,000 metric tonnes a year, with cold-chain potential that matters for North Andhra's seafood exporters and the pharmaceutical belt at Pydibhimavaram and Pusapatirega.

AI-run operations

An Airport Operations Control Centre using artificial intelligence, Building Information Modelling, Airside 4.0 systems, biometric passenger processing and automated baggage handling.

Built for cyclones

The extensive glass façade is engineered to withstand winds of up to 275 kmph — a necessary specification on a coastline that regularly takes severe cyclonic storms.

Sustainability by design

Energy-efficient heating, ventilation and cooling, along with other sustainability features intended to reduce operating load across the terminal's life.

Timeline

How Bhogapuram airport came together

  1. 27 January 2016

    Site clearance granted

    Central site clearance for the Bhogapuram greenfield project is issued, with the condition that scheduled commercial services at the Visakhapatnam civil enclave would close once the new airport is commissioned.

  2. 2024 – 2026

    Construction accelerates

    GMR Visakhapatnam International Airport Limited (GVIAL) pushes the terminal, the 3,800 m runway and landside infrastructure to completion, ahead of the original target date.

  3. July 2026

    Renamed and validated

    A Ministry of Civil Aviation gazette notification formally renames the airport the Alluri Sitarama Raju International Airport. A validation flight lands successfully, and land prices along the corridor jump.

  4. 1 August 2026

    Inaugurated by PM Narendra Modi

    The Prime Minister inaugurates the airport alongside Chief Minister N. Chandrababu Naidu, Deputy Chief Minister Pawan Kalyan, Governor S. Abdul Nazeer and Union Civil Aviation Minister K. Ram Mohan Naidu, and dedicates projects worth over ₹17,900 crore.

  5. 17 August 2026

    Commercial flights begin

    The airport is commissioned at 12:01 am. The IATA code VTZ transfers from the Visakhapatnam civil enclave at INS Dega, where scheduled commercial operations cease for 30 years.

Capacity roadmap

How big can it get?

The 2,203-acre site was sized so that each expansion phase is a build-out, not a rebuild.

PhaseCapacity
Phase 1 (open now)6 million passengers a year
Phase 212 million passengers a year
Phase 318 million passengers a year
Ultimate40+ million passengers a year
Getting there

Where is Bhogapuram airport and how do you reach it?

Short answer: about 40 to 45 km north-east of Visakhapatnam, roughly an hour by road on NH-16.

By road
The default option

NH-16 runs from Visakhapatnam through Madhurawada, Anandapuram and Tagarapuvalasa towards Bhogapuram. Taxis, app cabs and bus services operate on the corridor. Allow generous buffer time until traffic patterns settle.

By rail
Nearest stations

There is no railway station at Bhogapuram itself. Vizianagaram Junction (VZM) and Nellimarla are the closest, each a 20 to 30 minute drive from the airport.

Where to stay
Before an early flight

Bhogapuram itself still has thin hotel inventory. Bhimli is the closest town with real choice, with Rushikonda and Visakhapatnam city further along. See our guide to hotels and stays near the airport.

Bhogapuram airport: frequently asked questions

Direct answers to what people most often ask about the Alluri Sitarama Raju International Airport.

Bhogapuram is changing fast. Keep up with it.

Airport milestones, land price movements, new hotels and travel guidance — all in one place.