Skip to content

Now open: ASR International Airport (VTZ) — commercial flights from Sunday, 17 August 2026. Full guide

News & updates

Bhogapuram Airport News

Verified updates on Alluri Sitarama Raju International Airport (ASR International Airport, IATA: VTZ) at Bhogapuram — the inauguration, the code transfer from INS Dega, the start of commercial flights and what each change means for travellers.

Inauguration 1 Aug 2026Flights from 17 Aug 2026IATA: VTZOperator: GMR / GVIAL

Last updated · Sourced from Ministry of Civil Aviation gazette notifications and national press reporting.

inauguration
1 Aug 2026

By PM Narendra Modi

first commercial flights
17 Aug 2026

Scheduled services begin

VTZ code transfer
12:01 am

From INS Dega, 17 August

project cost
₹5,640 cr

GMR-built, PPP on DBFOT basis

Timeline

What has happened so far at Bhogapuram?

Two gazette notifications, one inauguration and one hard switchover date. Everything below is dated, sourced from the fact sheet we maintain for this site, and updated as new confirmations arrive.

  1. Flights

    Commercial flights start at Bhogapuram: IndiGo 6E 6408 from Hyderabad is the first arrival

    Alluri Sitarama Raju International Airport begins scheduled commercial operations. The IATA code VTZ transfers from INS Dega at 12:01 am. IndiGo 6E 6408 from Hyderabad is the first arrival; 6E 9051 to Hyderabad is listed as the first departure. Scoot operates Singapore and IndiGo operates Abu Dhabi among the opening international services. Air India, Air India Express and India One Air also operate. The last scheduled flight from the old Visakhapatnam airport was IndiGo 6E 2018 to Delhi at 10:45 pm on 16 August.

    Flights from Bhogapuram Airport
  2. Inauguration

    PM Narendra Modi inaugurates Alluri Sitarama Raju International Airport at Bhogapuram

    Prime Minister Narendra Modi inaugurates the Alluri Sitarama Raju International Airport at Bhogapuram on Saturday, 1 August 2026, arriving at 10:45 am, walking through the terminal at about 11:00 am and inaugurating the airport at around 11:30 am, followed by a public meeting until 12:55 pm. At the same event he dedicates development projects worth over ₹17,900 crore across Andhra Pradesh. Chief Minister N. Chandrababu Naidu, Deputy Chief Minister Pawan Kalyan, Governor S. Abdul Nazeer and Union Civil Aviation Minister K. Ram Mohan Naidu are among the dignitaries present.

    Read the full inauguration guide
  3. Inauguration

    13,000-plus tribal women and students rehearse the Dhimsa welcome

    Final preparations are complete at Bhogapuram on the eve of the inauguration. Around 13,000 to 13,500 tribal women and students have rehearsed the traditional Dhimsa dance that will greet the Prime Minister, making it the ceremonial centrepiece of the event. The airport is roughly 40–45 km from Visakhapatnam, about an hour by road on NH-16, which is the route most visitors will take on the day.

    How to reach the airport from Visakhapatnam
  4. Gazette notification

    Gazette notification: the VTZ code moves to Bhogapuram from 12:01 am on 17 August

    A Ministry of Civil Aviation gazette notification confirms that the IATA code VTZ transfers from the Visakhapatnam civil enclave at INS Dega to the new Bhogapuram airport at 12:01 am on Sunday, 17 August 2026. From that moment, a ticket that reads VTZ means Bhogapuram, not the old airport. Anyone flying on or after that date should check the airport address on the booking before setting out.

    What the VTZ code shift means for your ticket
  5. Gazette notification

    Bhogapuram greenfield airport formally renamed Alluri Sitarama Raju International Airport

    A Ministry of Civil Aviation gazette notification formally renames the Bhogapuram greenfield airport as Alluri Sitarama Raju International Airport, after the tribal freedom fighter of Andhra Pradesh. It is commonly shortened to ASR International Airport. Earlier references to Bhogapuram International Airport or the Bhogapuram Greenfield Airport describe the same facility.

    Who was Alluri Sitarama Raju?
  6. Flights

    Commercial operations confirmed for 17 August; INS Dega civil enclave closes to scheduled flights

    Commercial flight operations at Bhogapuram are confirmed to begin on Sunday, 17 August 2026, a little over two weeks after the inauguration. Scheduled commercial services at the Visakhapatnam civil enclave at INS Dega cease from that date for 30 years, while non-scheduled and charter movements and military operations continue there. Travellers should confirm the departure airport with their airline for any flight on or after 17 August 2026.

    Read the complete ASR airport guide
  7. Real estate

    Land prices in the airport corridor reported up 20–30% in key pockets

    Market reports following the validation flight put land price increases at 20–30% in key pockets of the Bhogapuram airport corridor, on top of roughly 12.5% over the preceding year. Land near the airport is quoted at about ₹22,000 per square yard, with nearby Denkada around ₹15,000 per square yard. These are realtor estimates rather than official data, so verify current rates, layout approvals and titles before committing to anything.

    Bhogapuram land and plot price guide
  8. Infrastructure

    Airport completed on 2,203 acres with a 3,800 m runway and a 78,000 sq m terminal

    The airport is built by GMR Visakhapatnam International Airport Limited (GVIAL) on a public-private partnership, DBFOT basis at a project cost of ₹5,640 crore. It covers 2,203 acres and its 3,800 m Code 4E runway, among the longest in India, can handle Boeing 777, Boeing 787 Dreamliner, Airbus A350 and Airbus A330 aircraft. The 78,000 sq m Phase 1 terminal is sized for 6 million passengers a year, with a glass façade engineered to withstand cyclonic winds of up to 275 kmph.

    Airport specifications and facilities
Bhogapuram airport: the dates that matter
InaugurationSaturday, 1 August 2026, by Prime Minister Narendra Modi
Projects dedicatedDevelopment projects worth over ₹17,900 crore in Andhra Pradesh
Commercial flights beginSunday, 17 August 2026
IATA codeVTZ — transfers from INS Dega at 12:01 am on 17 August 2026
Old airportVisakhapatnam civil enclave at INS Dega — scheduled commercial operations cease for 30 years
Developer / operatorGMR Visakhapatnam International Airport Limited (GVIAL)
Project cost₹5,640 crore
Distance from Visakhapatnamapproximately 40–45 km from Visakhapatnam city
In depth

Read our in-depth coverage

Each story above has a longer guide behind it — the inauguration schedule, the flight and code switchover, road access from Visakhapatnam, and what the airport is doing to land prices in the corridor.

View all guides
Airport8 min read

Yes, you can fly from Bhogapuram. Scheduled flights operate from Alluri Sitarama Raju International Airport under the VTZ code from 17 August 2026. Here is how to search, which airlines fly, and what to check on your ticket.

Read the guide
Airport7 min read

The Bhogapuram airport code is VTZ for bookings and VOVI for aviation. VTZ is not a new code: it transferred from the old Visakhapatnam airport at 12:01 am on 17 August 2026.

Read the guide
Travel7 min read

How far is Bhogapuram Airport from Vizag? About 40–45 km from the city and roughly an hour on NH-16 — longer from the railway station or Beach Road, shorter from Madhurawada.

Read the guide
Airport7 min read

There are two Bhogapuram airport opening dates. 1 August 2026 was the inauguration. 17 August 2026 was the first day of scheduled flights under the VTZ code.

Read the guide
Airport7 min read

Bhogapuram Airport started in 2026 — inaugurated on 1 August and open for scheduled flights from 17 August. Here is the year, and the decade of planning behind it.

Read the guide
Airport9 min read

A Wikipedia-style fact sheet for Bhogapuram Airport — official name, codes, location, dates, runway, airlines — plus the link to the English Wikipedia article.

Read the guide
Outlook

What happens next at Bhogapuram?

After 17 August 2026 the story becomes an operational one: how fast airlines add routes, whether cargo picks up, and how much of the promised aerotropolis around the airport actually gets built.

Route announcements

The thing to watch after 17 August 2026 is how quickly airlines build up schedules at VTZ. We will not publish a route or an airline here until it is confirmed, so check your airline's own schedule and your booking rather than relying on speculation.

Cargo operations

A 5,000 sq m cargo terminal with capacity for about 25,000 MT a year opens the region to direct air freight. That matters most to the pharma manufacturing hubs at Pusapatirega and Pydibhimavaram, both inside the airport's immediate catchment.

The aerotropolis

GMR has proposed an aerotropolis around the airport, with an aviation university and hospitality development among the ideas on the table. Around 500 of the 2,203 acres are reserved for future expansion, which is what gives the master plan its room to grow.

Phase 2 and beyond

Phase 1 is built for 6 million passengers a year. The published roadmap takes Phase 2 to 12 million, Phase 3 to 18 million and ultimately more than 40 million passengers a year, expanded in step with demand rather than on a fixed calendar.

The knock-on effects reach well beyond the terminal. Hotel supply along the corridor is the immediate constraint for anyone arriving before dawn — see hotels and stays near Bhogapuram airport for what exists today. The land market is moving faster than the infrastructure, which is why our Bhogapuram real estate guide treats the corridor as a five to seven year play rather than a ready-to-move suburb. And if you are flying in with a day to spare, the beaches, temples and hill stations in our guide to tourist places near Bhogapuram start about 20 km from the terminal.

Bhogapuram airport news: frequently asked questions

The dates, the code change and the switchover from INS Dega, answered in full.

Following the Bhogapuram airport story?

The airport guide keeps every verified specification in one place, and the blog goes deeper on flights, road access, property and travel across North Andhra.